What is stopping the line?
Choose what you can seeA stopped press can mean missing ingredients, a blocked exit or lost power. Start with the symptom you can actually observe.
Check the sand path before adding a press.
Follow sand from the chamber to the press. A route fault and a chamber capacity limit need different fixes.
Use this case only after checking the route and confirming the chamber is supplied and powered.
Recheck shared dust supply and power. Extra chamber capacity helps only while sand is the limiting stage.
Schematic examples, not measured layouts. The right change depends on the fault you confirm.
Make one change. Then observe.
Keep the working parts of your factory. Changing several stages at once makes the result harder to explain.
If material already reaches the next machine reliably, increasing upstream capacity may simply create a larger queue.
Did the expansion improve delivery?
- Compare matching observation windows.
- Keep collection conditions similar.
- Note starting and ending stockpiles.
- Check stone delivered to the base.
